On 7/15/2019 2:41 PM, Adam Roach wrote:
On 7/15/19 9:29 AM, Salz, Rich wrote:
Can you summarize the changes between this RFP and the last one? As
I recall, the purpose for doing an early RFP was to revise the
process (which presumably includes the RFP). Or am I mistaken?
With 18 months of lead-time, that was the plan. Removing 12 months
from the equation does have a planning impact.
/a
Don't you mean 30 months of lead time? And I assume there was some
sort of genesis of a plan described in the minutes of the RSOC that
described what you wanted to accomplish with an RSE re-compete -
perhaps your documented discussion could be shared with the rest of the
IETF?
Mike