On 7/15/19 9:29 AM, Salz, Rich wrote:
Can you summarize the changes between this RFP and the last one? As I recall, the purpose for doing an early RFP was to revise the process (which presumably includes the RFP). Or am I mistaken?
With 18 months of lead-time, that was the plan. Removing 12 months from the equation does have a planning impact.
/a