Re: [PATCH v2 3/3] lbespol: remove wild cards in mapfile

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



On Fri, Mar 13, 2020 at 6:03 AM Ondrej Mosnacek <omosnace@xxxxxxxxxx> wrote:
>
> On Thu, Mar 12, 2020 at 10:42 PM William Roberts
> <bill.c.roberts@xxxxxxxxx> wrote:
> > On Thu, Mar 12, 2020 at 3:21 PM Stephen Smalley
> > <stephen.smalley.work@xxxxxxxxx> wrote:
> > >
> > > On Thu, Mar 12, 2020 at 9:59 AM William Roberts
> > > <bill.c.roberts@xxxxxxxxx> wrote:
> > > >
> > > > I will fix the subject and add the Fixes: #165 to the commit when I
> > > > stage them if thats ok?
> > >
> > > Fixes both 165 and 204 IIUC because the real underlying issue for both was the
> > > fact that he was building with LTO and it was doing the wrong thing
> > > with hidden_def/hidden_proto.
> > > Otherwise works for me.  You can download the series from patchwork or
> > > via get-lore-mbox
> > > to pick up all the Acks automatically.
> >
> > I have no idea how to do that, Ill have to spend some time and
> > familiarize myself with it.
>
> You can simply go to
> https://patchwork.kernel.org/project/selinux/list/, click on any patch
> in the series (e.g. https://patchwork.kernel.org/patch/11430261/) and
> copy the address of the "series" button/link in the upper right
> corner. Then you just do:
>
> curl <link> | git am
>
> There is certainly a faster way to do it using the Patchwork CLI, but
> I never bothered to set that up :)

Thanks, ill have to try that next time!

>
> > For now I just manually added the acks and did the edits we discussed
> > and rebased ontop
> > of current master. Their was a simple conflict in libsepol/src/services.c.
> >
> > I have them staged here:
> > https://github.com/SELinuxProject/selinux/pull/207
>
> The CI failed because libsepol/src/services.c still includes "dso.h"
> in the rebased commits. You'll need to fix that first.

I'm sitting here thinking, "I built and ran the tests, how?" Looking
at bash history,
for libselinux, not libsepol!

>
> >
> > And since their were some minor edits before they go in, ill let them
> > sit a couple
> > of days for any last objections. Ill merge Monday March 16 end of workday if all
> > is silent.
>
> --
> Ondrej Mosnacek <omosnace at redhat dot com>
> Software Engineer, Security Technologies
> Red Hat, Inc.
>



[Index of Archives]     [Selinux Refpolicy]     [Linux SGX]     [Fedora Users]     [Fedora Desktop]     [Yosemite Photos]     [Yosemite Camping]     [Yosemite Campsites]     [KDE Users]     [Gnome Users]

  Powered by Linux