Re: [libgpiod][PATCH 2/2] tools: allow longer time periods

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



On Tue, Apr 9, 2024 at 6:05 PM Kent Gibson <warthog618@xxxxxxxxx> wrote:
>
> On Tue, Apr 09, 2024 at 04:58:52PM +0200, Gunnar Thörnqvist wrote:
> > Hi, Got a use case where a hold period is measured in more than seconds?
> > Specifically for a get.:::
> >
> > I can see a large number of use cases where the time can be hours, days and
> > weeks. In my case, pin 17 controls a relay that heats water when electricity
> > is cheapest. It is ok to only have seconds as unit but the range must be
> > larger. /Gunnar
> >
>
> I was asking specifically about the case for gpioget, where a long hold
> period makes absolutely no sense.
>

One could argue that this option doesn't make sense at all for gpioget. :)

I don't think it hurts to support a longer period of time even if only
for code reuse and less surface for bugs.

Bart





[Index of Archives]     [Linux SPI]     [Linux Kernel]     [Linux ARM (vger)]     [Linux ARM MSM]     [Linux Omap]     [Linux Arm]     [Linux Tegra]     [Fedora ARM]     [Linux for Samsung SOC]     [eCos]     [Linux Fastboot]     [Gcc Help]     [Git]     [DCCP]     [IETF Announce]     [Security]     [Linux MIPS]     [Yosemite Campsites]

  Powered by Linux