Expendable Launch Vehicle Status Report

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Sept. 4, 2009

George H. Diller
Kennedy Space Center, Fla.
321-867-2468
george.h.diller@nasa.gov

STATUS REPORT: ELV-090409

EXPENDABLE LAUNCH VEHICLE STATUS REPORT

Mission: Space Tracking and Surveillance System - Demonstrators 
Program (STSS-Demo) 
Launch Vehicle: Delta II 7920-10 
Launch Pad: Launch Pad 17-B, Cape Canaveral Air Force Station, Fla. 
Launch Date: No Earlier Than Sept. 17, 2009 
Launch Window: 8 - 9 p.m. EDT 

Prelaunch preparations at Pad 17B are going well and are on schedule. 
The Flight Program Verification took place Friday. This is an 
integrated electrical and mechanical test of the Delta II together 
with the STSS Demo payload that includes both countdown and flight 
event milestones.

The next major activity is the installation of the payload fairing 
around the STSS spacecraft next week on Sept. 9. 



Spacecraft: Solar Dynamics Observatory (SDO) 
Launch Vehicle: Atlas V-401 
Launch Pad: Launch Complex 41, Cape Canaveral Air Force Station, Fla. 
Launch Date: Feb. 3, 2010 

The launch of the Solar Dynamics Observatory is rescheduled to Feb. 3, 
2010, to allow sufficient time to launch the other planned missions 
that are ahead of SDO on the Atlas V manifest. 

On the evening of Sept. 2, a three-day SDO Launch/Mission Simulation 
came to a close. It began on Aug. 31 with a simulated launch, 
spacecraft separation from the Atlas V, solar array and antenna 
deployments, and a simulated contingency maneuver. The test was 
successful with only minor troubleshooting necessary. 



Spacecraft: Wide-field Infrared Survey Explorer (WISE) 
Launch Vehicle: Delta II 7320 
Launch Pad: SLC-2, Vandenberg Air Force Base, Calif. 
Launch Date: Dec. 7, 2009 

At the Astrotech payload processing facility on north Vandenberg, the 
WISE spacecraft functional testing was successfully completed early 
this week as planned. Simulated launch pad operations tests were 
performed on Sept. 1. These are functional tests associated with 
launch day spacecraft flight system power on and final configuration 
for launch. All were successfully completed. 

Build-up of the Delta II at Space Launch Complex 2 is scheduled to 
begin on Oct. 19 with hoisting of the first stage into the launcher. 



Previous status reports are available at:

http://www.nasa.gov/centers/kennedy/launchingrockets/status/index.html 
 

	
-end-



To subscribe to the list, send a message to: 
ksc-subscribe@newsletters.nasa.gov
To remove your address from the list, send a message to:
ksc-unsubscribe@newsletters.nasa.gov

[Index of Archives]     [KSC Site]     [NASA News]     [NASA Science News]     [JPL]     [Marshall Space Flight Center]     [NTSB]     [Yosemite News]     [Tuolumne Meadows Campground]     [STB]     [Deep Creek Forum]     [Cassini Status Reports]     [Telescopes]

  Powered by Linux