08.10.07 George Diller Kennedy Space Center, Fla. 321-867-2468 george.h.diller@nasa.gov STATUS REPORT: S-081007 NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads. If you are a member of the media and would like further information, visit: http://www.nasa.gov/centers/kennedy/news/index.html Mission: STS-118 - 22nd International Space Station Flight - S5 Truss Segment Vehicle: Endeavour (OV-105) Official Launch Date: Aug. 8, 2007 Expected Landing Date: Aug. 19, 2007 Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles Today is Flight Day 3 for STS-118. Endeavour is on orbit after launching from Pad 39A at KSC at 6:36 p.m. on Aug. 8. On Thursday, the crew conducted a photographic survey of the orbiter's thermal protection system using the robotic arm and extension boom. Today Commander Scott Kelly successfully flipped the orbiter using the rendezvous pitch maneuver prior to docking at the International Space Station. Docking occurred at 2:02 p.m. EDT. Mission: STS-120 - 23rd International Space Station Flight - U.S. Node 2 Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: Targeted for Oct. 23, 2007 Launch Pad: 39A Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles In Orbiter Processing Facility bay No. 3 this week, workers installed the right-hand orbital maneuvering system pod and connections are in work. Forward, mid-body and aft closeout work continues. Checkout of the orbiter's communications system is also in work. Stacking of the STS-120 solid rocket boosters in the Vehicle Assembly Building is complete, and closeout work is under way. Mission: STS-122 - 24th International Space Station Flight - Columbus Module Vehicle: Atlantis (OV-104) Location: Orbiter Processing Facility Bay 1 Launch Date: Targeted for Dec. 6, 2007 Launch Pad: 39A Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin and Walheim Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles In Orbiter Processing Bay No. 1, workers are installing new, stronger tiles, known as BRI tiles, around the main landing gear doors. Hydraulic positioning of the body flap and elevons is complete. The main landing gear tires were installed. Removal and replacement of fuel cell No. 3 due to abnormal voltage readings is under way. -end- To subscribe to the list, send a message to: ksc-subscribe@newsletters.nasa.gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters.nasa.gov