A change would get a +2 from a maintainer only once the maintainer believes that the patch is ready to be accepted. To be at this level of confidence, the change would have been reviewed thoroughly, and such a generally wouldn't fail regression (excluding spurious failures). If there was something that was overlooked that caused a regression failure, the fix will most likely be small and the subsequent review iterations would pass through quickly. Also, we have enough new maintainers to be sure that changes get the required review attention. There shouldn't be much delay in getting reviews. ~kaushal _______________________________________________ Gluster-devel mailing list Gluster-devel@xxxxxxxxxxx http://www.gluster.org/mailman/listinfo/gluster-devel