Re: Reduce regression runs wait time - New gerrit/review work flow

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



A change would get a +2 from a maintainer only once the maintainer
believes that the patch is ready to be accepted. To be at this level
of confidence, the change would have been reviewed thoroughly, and
such a generally wouldn't fail regression (excluding spurious
failures). If there was something that was overlooked that caused a
regression failure, the fix will most likely be small and the
subsequent review iterations would pass through quickly.

Also, we have enough new maintainers to be sure that changes get the
required review attention. There shouldn't be much delay in getting
reviews.

~kaushal
_______________________________________________
Gluster-devel mailing list
Gluster-devel@xxxxxxxxxxx
http://www.gluster.org/mailman/listinfo/gluster-devel



[Index of Archives]     [Gluster Users]     [Ceph Users]     [Linux ARM Kernel]     [Linux ARM]     [Linux Omap]     [Fedora ARM]     [IETF Annouce]     [Security]     [Bugtraq]     [Linux]     [Linux OMAP]     [Linux MIPS]     [eCos]     [Asterisk Internet PBX]     [Linux API]

  Powered by Linux