Sugg: Expiring of failed build on the buildsystem

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Hello,

I have got a look on the jobs assigned to me on the buildsys.

So I have found a failed job submitted on October of the last year. I think
it make no sense to keep a job longer then 2 or 3 month even if it was failed.

So I want to suggest, that all jobs older than three month should be deleted.

Best Regards:

Jochen Schmitt

Attachment: pgpXPVrnDwcDt.pgp
Description: PGP signature

-- 
fedora-extras-list mailing list
fedora-extras-list@xxxxxxxxxx
https://www.redhat.com/mailman/listinfo/fedora-extras-list

[Index of Archives]     [Fedora General Discussion]     [Fedora Art]     [Fedora Docs]     [Fedora Package Review]     [Fedora Desktop]     [Big List of Linux Books]     [Yosemite Backpacking]     [KDE Users]

  Powered by Linux