Re: [PATCH v2 1/9] drm/sched: Convert drm scheduler to use a work queue rather than kthread

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Hi Matt,

On 8/11/23 04:31, Matthew Brost wrote:
In XE, the new Intel GPU driver, a choice has made to have a 1 to 1
mapping between a drm_gpu_scheduler and drm_sched_entity. At first this
seems a bit odd but let us explain the reasoning below.

1. In XE the submission order from multiple drm_sched_entity is not
guaranteed to be the same completion even if targeting the same hardware
engine. This is because in XE we have a firmware scheduler, the GuC,
which allowed to reorder, timeslice, and preempt submissions. If a using
shared drm_gpu_scheduler across multiple drm_sched_entity, the TDR falls
apart as the TDR expects submission order == completion order. Using a
dedicated drm_gpu_scheduler per drm_sched_entity solve this problem.

2. In XE submissions are done via programming a ring buffer (circular
buffer), a drm_gpu_scheduler provides a limit on number of jobs, if the
limit of number jobs is set to RING_SIZE / MAX_SIZE_PER_JOB we get flow
control on the ring for free.

In XE, where does the limitation of MAX_SIZE_PER_JOB come from?

In Nouveau we currently do have such a limitation as well, but it is derived from the RING_SIZE, hence RING_SIZE / MAX_SIZE_PER_JOB would always be 1. However, I think most jobs won't actually utilize the whole ring.

Given that, it seems like it would be better to let the scheduler keep track of empty ring "slots" instead, such that the scheduler can deceide whether a subsequent job will still fit on the ring and if not re-evaluate once a previous job finished. Of course each submitted job would be required to carry the number of slots it requires on the ring.

What to you think of implementing this as alternative flow control mechanism? Implementation wise this could be a union with the existing hw_submission_limit.

- Danilo


A problem with this design is currently a drm_gpu_scheduler uses a
kthread for submission / job cleanup. This doesn't scale if a large
number of drm_gpu_scheduler are used. To work around the scaling issue,
use a worker rather than kthread for submission / job cleanup.

v2:
   - (Rob Clark) Fix msm build
   - Pass in run work queue
v3:
   - (Boris) don't have loop in worker
v4:
   - (Tvrtko) break out submit ready, stop, start helpers into own patch

Signed-off-by: Matthew Brost <matthew.brost@xxxxxxxxx>




[Index of Archives]     [Linux DRI Users]     [Linux Intel Graphics]     [Linux USB Devel]     [Video for Linux]     [Linux Audio Users]     [Yosemite News]     [Linux Kernel]     [Linux SCSI]     [XFree86]     [Linux USB Devel]     [Video for Linux]     [Linux Audio Users]     [Linux Kernel]     [Linux SCSI]     [XFree86]
  Powered by Linux