[Regression] drm/scheduler: track GPU active time per entity

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Hi all,

Commit df622729ddbf ("drm/scheduler: track GPU active time per entity") tries to track the accumulated time that a job was active on the GPU writing it to the entity through which the job was deployed to the scheduler originally. This is done within drm_sched_get_cleanup_job() which fetches a job from the schedulers pending_list.

Doing this can result in a race condition where the entity is already freed, but the entity's newly added elapsed_ns field is still accessed once the job is fetched from the pending_list.

After drm_sched_entity_destroy() being called it should be safe to free the structure that embeds the entity. However, a job originally handed over to the scheduler by this entity might still reside in the schedulers pending_list for cleanup after drm_sched_entity_destroy() already being called and the entity being freed. Hence, we can run into a UAF.

In my case it happened that a job, as explained above, was just picked from the schedulers pending_list after the entity was freed due to the client application exiting. Meanwhile this freed up memory was already allocated for a subsequent client applications job structure again. Hence, the new jobs memory got corrupted. Luckily, I was able to reproduce the same corruption over and over again by just using deqp-runner to run a specific set of VK test cases in parallel.

Fixing this issue doesn't seem to be very straightforward though (unless I miss something), which is why I'm writing this mail instead of sending a fix directly.

Spontaneously, I see three options to fix it:

1. Rather than embedding the entity into driver specific structures (e.g. tied to file_priv) we could allocate the entity separately and reference count it, such that it's only freed up once all jobs that were deployed through this entity are fetched from the schedulers pending list.

2. Somehow make sure drm_sched_entity_destroy() does block until all jobs deployed through this entity were fetched from the schedulers pending list. Though, I'm pretty sure that this is not really desirable.

3. Just revert the change and let drivers implement tracking of GPU active times themselves.

In the case of just reverting the change I'd propose to also set a jobs entity pointer to NULL once the job was taken from the entity, such that in case of a future issue we fail where the actual issue resides and to make it more obvious that the field shouldn't be used anymore after the job was taken from the entity.

I'm happy to implement the solution we agree on. However, it might also make sense to revert the change until we have a solution in place. I'm also happy to send a revert with a proper description of the problem. Please let me know what you think.

- Danilo




[Index of Archives]     [Linux DRI Users]     [Linux Intel Graphics]     [Linux USB Devel]     [Video for Linux]     [Linux Audio Users]     [Yosemite News]     [Linux Kernel]     [Linux SCSI]     [XFree86]     [Linux USB Devel]     [Video for Linux]     [Linux Audio Users]     [Linux Kernel]     [Linux SCSI]     [XFree86]
  Powered by Linux