[PATCH v4 08/14] drm/scheduler: Add fence deadline support

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



As the finished fence is the one that is exposed to userspace, and
therefore the one that other operations, like atomic update, would
block on, we need to propagate the deadline from from the finished
fence to the actual hw fence.

v2: Split into drm_sched_fence_set_parent() (ckoenig)
v3: Ensure a thread calling drm_sched_fence_set_deadline_finished() sees
    fence->parent set before drm_sched_fence_set_parent() does this
    test_bit(DMA_FENCE_FLAG_HAS_DEADLINE_BIT).

Signed-off-by: Rob Clark <robdclark@xxxxxxxxxxxx>
---
 drivers/gpu/drm/scheduler/sched_fence.c | 46 +++++++++++++++++++++++++
 drivers/gpu/drm/scheduler/sched_main.c  |  2 +-
 include/drm/gpu_scheduler.h             |  8 +++++
 3 files changed, 55 insertions(+), 1 deletion(-)

diff --git a/drivers/gpu/drm/scheduler/sched_fence.c b/drivers/gpu/drm/scheduler/sched_fence.c
index 7fd869520ef2..43e2d4f5fe3b 100644
--- a/drivers/gpu/drm/scheduler/sched_fence.c
+++ b/drivers/gpu/drm/scheduler/sched_fence.c
@@ -123,6 +123,37 @@ static void drm_sched_fence_release_finished(struct dma_fence *f)
 	dma_fence_put(&fence->scheduled);
 }
 
+static void drm_sched_fence_set_deadline_finished(struct dma_fence *f,
+						  ktime_t deadline)
+{
+	struct drm_sched_fence *fence = to_drm_sched_fence(f);
+	struct dma_fence *parent;
+	unsigned long flags;
+
+	spin_lock_irqsave(&fence->lock, flags);
+
+	/* If we already have an earlier deadline, keep it: */
+	if (test_bit(DMA_FENCE_FLAG_HAS_DEADLINE_BIT, &f->flags) &&
+	    ktime_before(fence->deadline, deadline)) {
+		spin_unlock_irqrestore(&fence->lock, flags);
+		return;
+	}
+
+	fence->deadline = deadline;
+	set_bit(DMA_FENCE_FLAG_HAS_DEADLINE_BIT, &f->flags);
+
+	spin_unlock_irqrestore(&fence->lock, flags);
+
+	/*
+	 * smp_load_aquire() to ensure that if we are racing another
+	 * thread calling drm_sched_fence_set_parent(), that we see
+	 * the parent set before it calls test_bit(HAS_DEADLINE_BIT)
+	 */
+	parent = smp_load_acquire(&fence->parent);
+	if (parent)
+		dma_fence_set_deadline(parent, deadline);
+}
+
 static const struct dma_fence_ops drm_sched_fence_ops_scheduled = {
 	.get_driver_name = drm_sched_fence_get_driver_name,
 	.get_timeline_name = drm_sched_fence_get_timeline_name,
@@ -133,6 +164,7 @@ static const struct dma_fence_ops drm_sched_fence_ops_finished = {
 	.get_driver_name = drm_sched_fence_get_driver_name,
 	.get_timeline_name = drm_sched_fence_get_timeline_name,
 	.release = drm_sched_fence_release_finished,
+	.set_deadline = drm_sched_fence_set_deadline_finished,
 };
 
 struct drm_sched_fence *to_drm_sched_fence(struct dma_fence *f)
@@ -147,6 +179,20 @@ struct drm_sched_fence *to_drm_sched_fence(struct dma_fence *f)
 }
 EXPORT_SYMBOL(to_drm_sched_fence);
 
+void drm_sched_fence_set_parent(struct drm_sched_fence *s_fence,
+				struct dma_fence *fence)
+{
+	/*
+	 * smp_store_release() to ensure another thread racing us
+	 * in drm_sched_fence_set_deadline_finished() sees the
+	 * fence's parent set before test_bit()
+	 */
+	smp_store_release(&s_fence->parent, dma_fence_get(fence));
+	if (test_bit(DMA_FENCE_FLAG_HAS_DEADLINE_BIT,
+		     &s_fence->finished.flags))
+		dma_fence_set_deadline(fence, s_fence->deadline);
+}
+
 struct drm_sched_fence *drm_sched_fence_alloc(struct drm_sched_entity *entity,
 					      void *owner)
 {
diff --git a/drivers/gpu/drm/scheduler/sched_main.c b/drivers/gpu/drm/scheduler/sched_main.c
index 4e6ad6e122bc..007f98c48f8d 100644
--- a/drivers/gpu/drm/scheduler/sched_main.c
+++ b/drivers/gpu/drm/scheduler/sched_main.c
@@ -1019,7 +1019,7 @@ static int drm_sched_main(void *param)
 		drm_sched_fence_scheduled(s_fence);
 
 		if (!IS_ERR_OR_NULL(fence)) {
-			s_fence->parent = dma_fence_get(fence);
+			drm_sched_fence_set_parent(s_fence, fence);
 			/* Drop for original kref_init of the fence */
 			dma_fence_put(fence);
 
diff --git a/include/drm/gpu_scheduler.h b/include/drm/gpu_scheduler.h
index 9db9e5e504ee..8b31a954a44d 100644
--- a/include/drm/gpu_scheduler.h
+++ b/include/drm/gpu_scheduler.h
@@ -280,6 +280,12 @@ struct drm_sched_fence {
          */
 	struct dma_fence		finished;
 
+	/**
+	 * @deadline: deadline set on &drm_sched_fence.finished which
+	 * potentially needs to be propagated to &drm_sched_fence.parent
+	 */
+	ktime_t				deadline;
+
         /**
          * @parent: the fence returned by &drm_sched_backend_ops.run_job
          * when scheduling the job on hardware. We signal the
@@ -568,6 +574,8 @@ void drm_sched_entity_set_priority(struct drm_sched_entity *entity,
 				   enum drm_sched_priority priority);
 bool drm_sched_entity_is_ready(struct drm_sched_entity *entity);
 
+void drm_sched_fence_set_parent(struct drm_sched_fence *s_fence,
+				struct dma_fence *fence);
 struct drm_sched_fence *drm_sched_fence_alloc(
 	struct drm_sched_entity *s_entity, void *owner);
 void drm_sched_fence_init(struct drm_sched_fence *fence,
-- 
2.39.1




[Index of Archives]     [Linux DRI Users]     [Linux Intel Graphics]     [Linux USB Devel]     [Video for Linux]     [Linux Audio Users]     [Yosemite News]     [Linux Kernel]     [Linux SCSI]     [XFree86]     [Linux USB Devel]     [Video for Linux]     [Linux Audio Users]     [Linux Kernel]     [Linux SCSI]     [XFree86]
  Powered by Linux