-Greg
On Thu, Jan 1, 2015 at 1:01 PM Aaron Bassett <aaron@xxxxxxxxxxxxxxxxx> wrote:
I’m doing some load testing on radosgw to get ready for production and I had a problem with it stalling out. I had 100 cores from several nodes doing multipart uploads in parallel. This ran great for about two days, managing to upload about 2000 objects with an average size of 100GB. Then it stalled out and stopped. Ever since then, the gw has been gc’ing very slowly. During the upload run, it was creating objects at ~ 100/s, now it’s cleaning them at ~3/s. At this rate it wont be done for nearly a year and this is only a fraction of the data I need to put in.
The pool I’m writing to is a cache pool at size 2 with an EC pool at 10+2 behind it. (This data is not mission critical so we are trying to save space). I don’t know if this will affect the slow gc or not.
I tried turning up rgw gc max objs to 256, but it didn’t seem to make a difference.
I’m working under the assumption that my uploads started stalling because too many un-gc’ed parts accumulated, but I may be way off base there.
Any thoughts would be much appreciated, Aaron
_______________________________________________
ceph-users mailing list
ceph-users@xxxxxxxxxxxxxx
http://lists.ceph.com/listinfo.cgi/ceph-users-ceph.com
_______________________________________________ ceph-users mailing list ceph-users@xxxxxxxxxxxxxx http://lists.ceph.com/listinfo.cgi/ceph-users-ceph.com