Re: Freeze for Test1 is in 2 weeks + 1 day

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



On Monday 08 January 2007 16:37, Dennis Gilmore wrote:
> not necessary.  we just don't push for the freeze window.
>
> > 2) Open a freeze-update blocker bug in bugzilla
> >
> :) we need that
> :
> > 3) Create the Freeze Review Team
>
> We would need to create a special build target so that we don't pull in
> other packages built in the mean time.  when a package is acked  it gets
> built for both the unpublished devel tree and the  published one.  packages
> in the unpublished tree get a .1 at the end of its release.

Why build twice?

What we do internally is setup a second build target, that for the duration of 
the freeze does not self-update (builds are not available for later builds).  
Builds continue, and when we need some specific fix, we copy/tag it from the 
second build target to the frozen target.  Once the freeze is over, the 
packages remaining in the second target are just sourced into the maintarget 
and life goes on.

-- 
Jesse Keating
Release Engineer: Fedora

Attachment: pgpFNZeEA42Wp.pgp
Description: PGP signature

--
Fedora-maintainers mailing list
Fedora-maintainers@xxxxxxxxxx
https://www.redhat.com/mailman/listinfo/fedora-maintainers
--
Fedora-maintainers-readonly mailing list
Fedora-maintainers-readonly@xxxxxxxxxx
https://www.redhat.com/mailman/listinfo/fedora-maintainers-readonly

[Index of Archives]     [Fedora Users]     [Fedora Development]     [Fedora Devel Java]     [Fedora Legacy]     [Fedora Desktop]     [Fedora SELinux]     [Big List of Linux Books]     [Yosemite News]     [KDE Users]

  Powered by Linux