[ Upstream commit 2e1f164861e500f4e068a9d909bbd3fcc7841483 ] When doing a loopback test at copper ports, the serdes loopback and the phy loopback will fail, because of the adjust link had not finished, and phy not ready. Adds sleep between adjust link and test process to fix it. Signed-off-by: Yonglong Liu <liuyonglong@xxxxxxxxxx> Signed-off-by: David S. Miller <davem@xxxxxxxxxxxxx> Signed-off-by: Sasha Levin <sashal@xxxxxxxxxx> --- drivers/net/ethernet/hisilicon/hns/hns_ethtool.c | 4 ++++ 1 file changed, 4 insertions(+) diff --git a/drivers/net/ethernet/hisilicon/hns/hns_ethtool.c b/drivers/net/ethernet/hisilicon/hns/hns_ethtool.c index 4cd163390dcc..f38848c4f69d 100644 --- a/drivers/net/ethernet/hisilicon/hns/hns_ethtool.c +++ b/drivers/net/ethernet/hisilicon/hns/hns_ethtool.c @@ -367,6 +367,7 @@ static int __lb_setup(struct net_device *ndev, static int __lb_up(struct net_device *ndev, enum hnae_loop loop_mode) { +#define NIC_LB_TEST_WAIT_PHY_LINK_TIME 300 struct hns_nic_priv *priv = netdev_priv(ndev); struct hnae_handle *h = priv->ae_handle; int speed, duplex; @@ -393,6 +394,9 @@ static int __lb_up(struct net_device *ndev, h->dev->ops->adjust_link(h, speed, duplex); + /* wait adjust link done and phy ready */ + msleep(NIC_LB_TEST_WAIT_PHY_LINK_TIME); + return 0; } -- 2.20.1