On Mon, 11 Sep 2017, Ping Cheng wrote: > Only the first 2 need to go in 4.14-rc. The other 4 can wait until > 4.15 is open, as you suggested. Thanks a lot for verifying. Applied the first two to for-4.14/upstream-fixes and the rest on top into for-4.15/wacom -- Jiri Kosina SUSE Labs