Hi, On 7 March 2012 10:36, John R Pierce <pierce@xxxxxxxxxxxx> wrote: > On 03/06/12 3:31 PM, Ondrej Ivanič wrote: >> >> - one side completely down: Client should use switch to other side >> transparently (Failover / High Availability) > > > what happens if the link between the sites is down and both sides decide > they are master? then how do you put the pieces back together ? Good catch! From application point of it is quite easy to sync data between sites. Let's assume that writes should be disabled in this scenario. -- Ondrej Ivanic (ondrej.ivanic@xxxxxxxxx) -- Sent via pgsql-general mailing list (pgsql-general@xxxxxxxxxxxxxx) To make changes to your subscription: http://www.postgresql.org/mailpref/pgsql-general