On Thu, Nov 9, 2017 at 10:32 AM, Shreeyansh Dba <shreeyansh2014@xxxxxxxxx> wrote:
On Wed, Nov 8, 2017 at 9:47 PM, rammohan ganapavarapu <rammohanganap@xxxxxxxxx> wrote:David,So initially i have physical replication configured, so to upgrade slave to 9.6 version i did converted master slave to logical replication and then try to upgrade the slave to 9.6. I am getting this error when i try to start the slave. Any idea?2017-11-08 05:08:49 UTC [20063]: [1-1] user= db= host= LOG: shutting down2017-11-08 05:08:49 UTC [20063]: [2-1] user= db= host= LOG: database system is shut down2017-11-08 05:09:45 UTC [20322]: [1-1] user= db= host= LOG: database system was shut down at 2017-11-08 05:08:55 UTC2017-11-08 05:09:45 UTC [20322]: [2-1] user= db= host= LOG: entering standby mode2017-11-08 05:09:45 UTC [20322]: [3-1] user= db= host= WARNING: WAL was generated with wal_level=minimal, data may be missing2017-11-08 05:09:45 UTC [20322]: [4-1] user= db= host= HINT: This happens if you temporarily set wal_level=minimal without taking a new base backup.2017-11-08 05:09:45 UTC [20322]: [5-1] user= db= host= FATAL: hot standby is not possible because wal_level was not set to "replica" or higher on the master server2017-11-08 05:09:45 UTC [20322]: [6-1] user= db= host= HINT: Either set wal_level to "replica" on the master, or turn off hot_standby here.2017-11-08 05:09:45 UTC [20312]: [3-1] user= db= host= LOG: startup process (PID 20322) exited with exit code 12017-11-08 05:09:45 UTC [20312]: [4-1] user= db= host= LOG: aborting startup due to startup process failure2017-11-08 05:09:45 UTC [20312]: [5-1] user= db= host= LOG: database system is shut downThanks,RamOn Mon, Oct 9, 2017 at 4:15 PM, David G. Johnston <david.g.johnston@xxxxxxxxx> wrote:Hi,Is it possible to add 9.6 version Slave to 9.4 master?Physical replication, no; Logical replication, yes - if the software you are using is compatible with both versions.David J.In addition to above, Slony also an option for keeping master & slave on different versions which play a key role during upgrades for reducing downtime drastically.