Re: upgrade proc with pitr standby

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



On Tue, 2010-05-11 at 09:16 -0400, Ray Stell wrote:
> What are the steps for upgrade of a primary/PITR standby pair to the 
> latest 8.3 patchset, 8.3.6-8.3.10?  I don't see this in the docs. 
> Should there be something added to 15.4. Upgrading?   
> 
> My guess is:
> 1. turn off the standby config in primary
> 2. upgrade primary
> 3. rebuild standby 

You need to upgrade standby first, restart it. Then, upgrade master and
restart it. No need to turn off standby config.

Regards,
-- 
Devrim GÜNDÜZ
PostgreSQL Danışmanı/Consultant, Red Hat Certified Engineer
PostgreSQL RPM Repository: http://yum.pgrpms.org
Community: devrim~PostgreSQL.org, devrim.gunduz~linux.org.tr
http://www.gunduz.org  Twitter: http://twitter.com/devrimgunduz

Attachment: signature.asc
Description: This is a digitally signed message part


[Index of Archives]     [KVM ARM]     [KVM ia64]     [KVM ppc]     [Virtualization Tools]     [Spice Development]     [Libvirt]     [Libvirt Users]     [Linux USB Devel]     [Linux Audio Users]     [Yosemite Questions]     [Linux Kernel]     [Linux SCSI]     [XFree86]

  Powered by Linux