STATUS REPORT: SS07-07

INTERNATIONAL SPACE STATION STATUS REPORT: SS07-07

HOUSTON - With all scheduled tasks accomplished, International Space 
Station Commander Mike Lopez-Alegria and Flight Engineer Sunita 
Williams ended a nearly seven hour spacewalk at 2:06 p.m. CST 
Thursday. 

It was the last in a series of three spacewalks in nine days from the 
Quest airlock. Major tasks of this spacewalk included removing and 
jettisoning two large shrouds and installing an attachment for cargo 
carriers. 

Lopez-Alegria and Williams moved from the airlock out to Crew 
Equipment Transfer Aid carts on the rails of the main truss. Pushing 
one cart with their equipment, including a foot restraint, they moved 
to the Port 3 truss segment. Their first job was to remove two 
thermal shrouds, one from each of two Rotary Joint Motor Controllers 
on P3. 

Next, they removed two large shrouds from P3 Bays 18 and 20. The 
shrouds, larger than king-size bed sheets, provide thermal shading. 
With the station in its present orientation, they are no longer 
needed and are being removed to avoid trapping heat. Lopez-Alegria 
jettisoned them toward the rear of the station. 

Afterward, the Unpressurized Cargo Carrier Assembly Attachment Systems 
on the upper face of the P3 truss was deployed. That was done in 
preparation for attachment of a cargo carrier during a future shuttle 
mission. While Lopez-Alegria finished work on the assembly attachment 
system, Williams moved to the end of the P5 truss to remove two 
launch locks in preparation for the relocation of the P6 truss. 

The final scheduled task of the spacewalk was connecting four cables 
of the Station to Shuttle Power Transfer System to Pressurized Mating 
Adapter-2 (PMA-2) at the forward end of the Destiny laboratory where 
shuttles dock. This will allow visiting shuttles to take power from 
the station to extend their missions. 

Work began on the system during the Jan. 31 spacewalk, and two of the 
cables were routed and connected to PMA-2 on the Feb. 4 spacewalk. 
The last four cables were connected to the PMA Thursday. The 
astronauts did complete one get-ahead task to photograph a suspect 
connector on the outboard end of PMA-2. It carries station shuttle 
communications when the shuttle is docked but hatches are closed. 
Communications have been intermittent during recent shuttle missions. 


Throughout the spacewalk, Chris Looper in Johnson Space Center's 
Mission Control advised Lopez-Alegria and Williams and monitored 
their tasks. Looper is the chief engineer for the Astronaut Office 
Spacewalk Branch. 

Approximately 3 hours, 50 minutes into his ninth spacewalk, 
Lopez-Alegria set a record for cumulative spacewalk time by a U.S. 
astronaut at 61 hours, 22 minutes. Jerry Ross previously held the 
title with 58 hours, 32-minutes accumulated during nine spacewalks. 

The three spacewalks from the Quest airlock in U.S. spacesuits and a 
Russian spacewalk on Feb. 22 are the most ever done by station crew 
members during such a short period. Starting from scratch, it takes 
crew members about 100 hours to prepare for a spacewalk. By doing the 
U.S. spacewalks just a few days apart, considerable crew time can be 
saved by not having to repeat some of the preparation. 

Thursday's spacewalk was the 80th for station assembly and 
maintenance. It was the 52nd from the station and the 32nd from 
Quest. It was the fourth for Williams, the most for any woman. 

During the Feb. 22 spacewalk, Lopez-Alegria and Flight Engineer 
Mikhail Tyurin will wear Russian Orlan suits to work on an antenna on 
the Progress 23 cargo ship docked at the aft port of the Zvezda 
service module. The antenna did not properly retract when that 
spacecraft docked in October. The spacewalkers will try to secure or 
remove the antenna to avoid any interference with the undocking of a 
Progress in April. The spacewalk will be the 10th for Lopez Alegria 
and will set a new record. 

For more about the crew's activities and station sighting 
opportunities, visit: 

http://www.nasa.gov/station 

	
-end-



To subscribe to the list, send a message to: 
hqnews-subscribe@xxxxxxxxxxxxxxxxxxxxxx
To remove your address from the list, send a message to:
hqnews-unsubscribe@xxxxxxxxxxxxxxxxxxxxxx
[Index of Archives]     [JPL News]     [Cassini News From Saturn]     [NASA Marshall Space Flight Center News]     [NASA Science News]     [James Web Space Telescope News]     [JPL Home]     [NASA KSC]     [NTSB]     [Deep Creek Hot Springs]     [Yosemite Discussion]     [NSF]     [Telescopes]

  Powered by Linux