http://rfs-rf.ru/upload/medialibrary/c1a/prilozhenie-1-k-resheniyu-gkrch-_-16_36_03.pdf Note that there was never a DFS requirement in Russia, but always was NO-OUTDOOR on 5GHz. Maximum power is 200mW that is ~23dBm on all 5GHz channels. Also Russia has never been regulated by ETSI. EIRP has been reduced by 4dBm because of TPC requirement. Signed-off-by: Dmitry Tunin <hanipouspilot@xxxxxxxxx> --- db.txt | 12 +++++------- 1 file changed, 5 insertions(+), 7 deletions(-) diff --git a/db.txt b/db.txt index 37393e6..9e4dc27 100644 --- a/db.txt +++ b/db.txt @@ -1097,14 +1097,12 @@ country RS: DFS-ETSI # 60 GHz band channels 1-4, ref: Etsi En 302 567 (57000 - 66000 @ 2160), (40) -country RU: DFS-ETSI - (2402 - 2482 @ 40), (20) - (5170 - 5250 @ 80), (20), AUTO-BW - (5250 - 5330 @ 80), (20), DFS, AUTO-BW - (5650 - 5730 @ 80), (30), DFS - (5735 - 5835 @ 80), (30) +country RU: + (2400 - 2483.5 @ 40), (20) + (5150 - 5350 @ 160), (20), NO-OUTDOOR + (5650 - 5850 @ 160), (20), NO-OUTDOOR # 60 GHz band channels 1-4, ref: Changes to NLA 124_Order №129_22042015.pdf - (57000 - 66000 @ 2160), (40) + (57000 - 66000 @ 2160), (40), NO-OUTDOOR country RW: DFS-FCC (2402 - 2482 @ 40), (20) -- 2.7.4