On Tue, Feb 17, 2015 at 09:55:21AM -0500, Alan Stern wrote: > On Mon, 16 Feb 2015, Felipe Balbi wrote: > > > Electrical tests for resume signaling. It failed with a specific hub, > > however :-) But it's easy to note with dwc3/musb and a USB sniffer. > > Sometimes resume signalling is cut before 20ms because we had msleep(20) > > :-) > > Maybe that should be reported to the architecture maintainers. I'm not > certain, but I'm pretty sure that msleep(20) should _never_ sleep for > less than 20 ms. doesn't lpj calibration play a role here ? -- balbi
Attachment:
signature.asc
Description: Digital signature