On Thu, 2020-10-22 at 22:10 +0200, Giovanni Gherdovich wrote: > [...] > To read the tables: > > Tilde (~) means the result is the same as baseline (or, the ratio is close > to 1). The double asterisk (**) is a visual aid and means the result is > worse than baseline (higher or lower depending on the case). Ouch, the opposite. Double asterisk (**) is where the result is better than baseline, and schedutil needs improvement. Giovanni