Le Mon, 21 Mar 2022 11:36:34 -0700, Jakub Kicinski <kuba@xxxxxxxxxx> a écrit : > > Hi Jakub, > > > > Ok, to be clear, you would like a series which contains all the > > "base" fwnode functions that I'm going to add to be sent separately > > right ? And then also split i2c/net stuff that was sent in this series ? > > I'm mostly concerned about conflicts, so if you can get the entire > series into 5.18 before the merge window is over then consider it > acked. If it doesn't make 5.18 looks like you'd need to send patches > 1 and 2 as a PR so that both the i2c and net trees can pull it. > Once pulled send patch 6 out to net-next. Does that make sense? Yes totally, I guess I'll go for I2C only and then I'll move on with next patches individually later. No need to hurry. -- Clément Léger, Embedded Linux and Kernel engineer at Bootlin https://bootlin.com