some speling fixes: * Juri Lelli <juri.lelli@xxxxxxx> wrote: > From: Luca Abeni <luca.abeni@xxxxxxxx> > > Admission control is of key importance for SCHED_DEADLINE, since it guarantees > system schedulability (or tells us something about the degree of guarantees > we can provide to the user). > > This patch improves and clarifies bits and pieces regarding AC, both for UP > and SMP systems. > > Signed-off-by: Luca Abeni <luca.abeni@xxxxxxxx> > Signed-off-by: Juri Lelli <juri.lelli@xxxxxxx> > Cc: Randy Dunlap <rdunlap@xxxxxxxxxxxxx> > Cc: Peter Zijlstra <peterz@xxxxxxxxxxxxx> > Cc: Ingo Molnar <mingo@xxxxxxxxxx> > Cc: Henrik Austad <henrik@xxxxxxxxx> > Cc: Dario Faggioli <raistlin@xxxxxxxx> > Cc: Juri Lelli <juri.lelli@xxxxxxxxx> > Cc: linux-doc@xxxxxxxxxxxxxxx > Cc: linux-kernel@xxxxxxxxxxxxxxx > --- > Documentation/scheduler/sched-deadline.txt | 87 +++++++++++++++++++++++++----- > 1 file changed, 73 insertions(+), 14 deletions(-) > > diff --git a/Documentation/scheduler/sched-deadline.txt b/Documentation/scheduler/sched-deadline.txt > index 8372c3d..10fc4c4 100644 > --- a/Documentation/scheduler/sched-deadline.txt > +++ b/Documentation/scheduler/sched-deadline.txt > @@ -38,16 +38,17 @@ CONTENTS > ================== > > SCHED_DEADLINE uses three parameters, named "runtime", "period", and > - "deadline" to schedule tasks. A SCHED_DEADLINE task is guaranteed to receive > + "deadline" to schedule tasks. A SCHED_DEADLINE task should receive Comma before 'to'? > "runtime" microseconds of execution time every "period" microseconds, and > these "runtime" microseconds are available within "deadline" microseconds > from the beginning of the period. In order to implement this behaviour, > every time the task wakes up, the scheduler computes a "scheduling deadline" > consistent with the guarantee (using the CBS[2,3] algorithm). Tasks are then > scheduled using EDF[1] on these scheduling deadlines (the task with the > - closest scheduling deadline is selected for execution). Notice that this > - guaranteed is respected if a proper "admission control" strategy (see Section > - "4. Bandwidth management") is used. > + closest scheduling deadline is selected for execution). Notice that the > + task actually receives "runtime" time units within "deadline" if a proper > + "admission control" strategy (see Section "4. Bandwidth management") is used > + (clearly, if the system is overloaded this guarantee cannot be respected). > > Summing up, the CBS[2,3] algorithms assigns scheduling deadlines to tasks so > that each task runs for at most its runtime every period, avoiding any > @@ -134,6 +135,48 @@ CONTENTS > A real-time task can be periodic with period P if r_{j+1} = r_j + P, or > sporadic with minimum inter-arrival time P is r_{j+1} >= r_j + P. Finally, > d_j = r_j + D, where D is the task's relative deadline. > + The utilisation of a real-time task is defined as the ratio between its > + WCET and its period (or minimum inter-arrival time), and represents > + the fraction of CPU time needed to execute the task. > + > + If the total utilisation sum_i(WCET_i/P_i) (sum of the utilisations > + WCET_i/P_i of all the tasks in the system - notice that when considering > + multiple tasks, the parameters of the i-th one are indicated with the "_i" > + suffix) is larger than M (with M equal to the number of CPUs), then the > + system will surely not be able to respect all of the deadlines, and no > + execution time is guaranteed for non real-time tasks, which risk to be > + starved by real-time tasks. The last part doesn't really parse as correct English for me - maybe also split this overly long sentence into two or three sentences, to make it easier to understand? > + If, instead, the total utilisation is smaller than M, then non real-time > + tasks will not be starved and the system might be able to respect all the > + deadlines. > + As a matter of fact, in this case it is possible to provide an upper bound > + for the tardiness (defined as the maximum between 0 and the difference > + between the finishing time of a job and its absolute deadline). s/the tardiness/tardiness ? > + More precisely, it can be proved that using a global EDF scheduler the s/proved/proven > + maximum tardiness of each task is smaller or equal than > + ((M − 1) · WCET_max − WCET_min)/(M − (M − 2) · U_max) + WCET_max > + where WCET_max = max_i{WCET_i} is the maximum WCET, WCET_min=min_i{WCET_i} > + is the minimum WCET, and U_max = max_i{WCET_i/P_i} is the maximum utilisation. > + > + If M=1 (uniprocessor system), or in case of partitioned scheduling (each > + real-time task is statically assigned to one and only one CPU), then it is > + possible to formally check if all the deadlines are respected. s/then it is possible/it is possible ? > + If D_i = P_i for all tasks, then EDF is able to respect all the deadlines > + of all the tasks executing on a CPU if and only if the total utilisation > + of the tasks running on such a CPU is smaller or equal than 1. > + If D_i != P_i for some task, then it is possible to define the density of > + a task as C_i/min{D_i,T_i}, and EDF is able to respect all of the deadlines s/all of the deadlines/all the deadlines ? > + of all the tasks running on a CPU if the sum sum_i C_i/min{D_i,T_i} of the > + densities of the tasks running on such a CPU is smaller or equal than 1 > + (notice that this condition is only sufficient, and not necessary). > + > + On multiprocessor systems with global EDF scheduling (non partitioned > + systems), a sufficient test for schedulability can not be based on the > + utilisations (it can be shown that task sets with utilisations slightly > + larger than 1 can miss deadlines regardless of the number of CPUs M). > + However, as previously stated enforcing that the total utilisation is smaller Comma after 'stated'. > + than M is enough to guarantee that non real-time tasks are not starved and > + the real-time tasks tardiness has an upper bound. > s/and the real-time/and that the real-time s/the real-time tasks tardiness/the tardiness of real-time tasks > SCHED_DEADLINE can be used to schedule real-time tasks guaranteeing that > the jobs' deadlines of a task are respected. In order to do this, a task > @@ -163,14 +206,22 @@ CONTENTS > 4. Bandwidth management > ======================= > > - In order for the -deadline scheduling to be effective and useful, it is > - important to have some method to keep the allocation of the available CPU > - bandwidth to the tasks under control. This is usually called "admission > - control" and if it is not performed at all, no guarantee can be given on > - the actual scheduling of the -deadline tasks. > - > - The interface used to control the fraction of CPU bandwidth that can be > - allocated to -deadline tasks is similar to the one already used for -rt > + As previously mentioned, in order for the -deadline scheduling to be s/the -deadline scheduling/-deadline scheduling > + effective and useful (that is, to be able to provide "runtime" time units > + within "deadline"), it is important to have some method to keep the allocation > + of the available fractions of CPU time to the various tasks under control. > + This is usually called "admission control" and if it is not performed, then > + no guarantee can be given on the actual scheduling of the -deadline tasks. > + > + As already stated in Section 3, a necessary condition to be respected to > + correctly schedule a set of real-time tasks is that the total utilisation > + is smaller than M. When talking about -deadline tasks, this requires to > + impose that the sum of the ratio between runtime and period for all tasks > + is smaller than M. Notice that the ratio runtime/period is equivalent to > + the utilisation of a "traditional" real-time task, and is also often > + referred as "bandwidth". s/referred as/referred to as ? Thanks, Ingo -- To unsubscribe from this list: send the line "unsubscribe linux-doc" in the body of a message to majordomo@xxxxxxxxxxxxxxx More majordomo info at http://vger.kernel.org/majordomo-info.html