[PATCH v4 2/2] sched/deadline: Update GRUB description in the documentation

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Update the details of GRUB to reflect the updated logic.

Signed-off-by: Vineeth Pillai (Google) <vineeth@xxxxxxxxxxxxxxx>
---
 Documentation/scheduler/sched-deadline.rst | 5 ++++-
 1 file changed, 4 insertions(+), 1 deletion(-)

diff --git a/Documentation/scheduler/sched-deadline.rst b/Documentation/scheduler/sched-deadline.rst
index 9d9be52f221a..d9f9f10c2191 100644
--- a/Documentation/scheduler/sched-deadline.rst
+++ b/Documentation/scheduler/sched-deadline.rst
@@ -203,12 +203,15 @@ Deadline Task Scheduling
   - Total bandwidth (this_bw): this is the sum of all tasks "belonging" to the
     runqueue, including the tasks in Inactive state.
 
+  - Maximum usable bandwidth (max_bw): This is the maximum bandwidth usable by
+    deadline tasks and is currently set to the RT capacity.
+
 
  The algorithm reclaims the bandwidth of the tasks in Inactive state.
  It does so by decrementing the runtime of the executing task Ti at a pace equal
  to
 
-           dq = -max{ Ui / Umax, (1 - Uinact - Uextra) } dt
+           dq = -(max{ Ui, (1 - Uinact - Uextra) } / Umax) dt
 
  where:
 
-- 
2.40.1




[Index of Archives]     [Kernel Newbies]     [Security]     [Netfilter]     [Bugtraq]     [Linux FS]     [Yosemite Forum]     [MIPS Linux]     [ARM Linux]     [Linux Security]     [Linux RAID]     [Samba]     [Video 4 Linux]     [Device Mapper]     [Linux Resources]

  Powered by Linux