Re: [PATCH v3 2/5] sched/deadline: Fix reclaim inaccuracy with SMP

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Hi Luca,

> >
> > I think it probably makes sense to get the fix for the equation to go
> > in as a first step and then we can investigate more about the second
> > issue (less reclaiming with less load and different bandwidth) and
> > fix it separately. What do you think?
>
> I fully agree. If you split this change in a first patch, IMHO it
> can be applied.
>
Thanks, I shall have it as the first patch in the next iteration.

> BTW, I tried changing the equation without introducing div64, and it
> seems to me that it works well... So, if removing the bw_ratio
> approximation is needed, I think you can do it in a second patch (so,
> the first patch changes the reclaiming equation, and the second one
> introduces div64)
>
There was one more reason for removing the bw_ratio. The second patch
fixing the issue with mix of normal and SCHED_FLAG_RECLAIM tasks,
do not have a constant Umax, so we cannot calculate the bw_ratio in
advance and has to be calculated in grub_reclaim().

As you suggested, I shall remove the bw_ratio as the second patch and
then have the third patch to fix the case of SCHED_FLAG_RECLAIM and
normal deadline tasks. For the rest of the issues, I shall work on it as
a separate patch series once this goes in.

Will send it out tomorrow after a bit more testing.

Thanks again,
Vineeth



[Index of Archives]     [Kernel Newbies]     [Security]     [Netfilter]     [Bugtraq]     [Linux FS]     [Yosemite Forum]     [MIPS Linux]     [ARM Linux]     [Linux Security]     [Linux RAID]     [Samba]     [Video 4 Linux]     [Device Mapper]     [Linux Resources]

  Powered by Linux