On 09.03.2021 22:57:46, Vincent Mailhol wrote: > A set of two incremental patches to be applied to the v2. > Both patches are fully cosmetics. Squashed and updated linux-can-next/testing Thanks, Marc -- Pengutronix e.K. | Marc Kleine-Budde | Embedded Linux | https://www.pengutronix.de | Vertretung West/Dortmund | Phone: +49-231-2826-924 | Amtsgericht Hildesheim, HRA 2686 | Fax: +49-5121-206917-5555 |
Attachment:
signature.asc
Description: PGP signature