[PATCH BlueZ 1/2] tools/mgmt-tester: Adjust test setup complete check

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



This changes check for setup complete in client_cmd_complete() callback
from tester_setup_complete() to test_setup_condition_complete(). This
allows for combining setup conditions when setup_bthost() is called.
---
 tools/mgmt-tester.c | 3 ++-
 1 file changed, 2 insertions(+), 1 deletion(-)

diff --git a/tools/mgmt-tester.c b/tools/mgmt-tester.c
index 4dd3490c2..657b7aaa0 100644
--- a/tools/mgmt-tester.c
+++ b/tools/mgmt-tester.c
@@ -5831,7 +5831,7 @@ static void client_cmd_complete(uint16_t opcode, uint8_t status,
 	if (status)
 		tester_setup_failed();
 	else
-		tester_setup_complete();
+		test_setup_condition_complete(data);
 }
 
 static void setup_bthost(void)
@@ -5842,6 +5842,7 @@ static void setup_bthost(void)
 
 	bthost = hciemu_client_get_host(data->hciemu);
 	bthost_set_cmd_complete_cb(bthost, client_cmd_complete, data);
+	test_add_setup_condition(data);
 
 	if (data->hciemu_type == HCIEMU_TYPE_LE ||
 		test->client_enable_adv) {
-- 
2.26.3




[Index of Archives]     [Bluez Devel]     [Linux Wireless Networking]     [Linux Wireless Personal Area Networking]     [Linux ATH6KL]     [Linux USB Devel]     [Linux Media Drivers]     [Linux Audio Users]     [Linux Kernel]     [Linux SCSI]     [Big List of Linux Books]

  Powered by Linux