Expendable Launch Vehicle Status Report

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Dec. 18, 2009

George H. Diller
Kennedy Space Center, Fla.
321-867-2468
george.h.diller@nasa.gov

STATUS REPORT: ELV-121809

EXPENDABLE LAUNCH VEHICLE STATUS REPORT

Spacecraft: Solar Dynamics Observatory (SDO)
Launch Vehicle: Atlas V-401
Launch Pad: Launch Complex 41, Cape Canaveral Air Force Station, Fla.
Launch Date:  Feb. 3, 2010
Launch Window: 10:53 - 11:53 a.m. EST 

At the Astrotech payload processing facility, SDO solar arrays were 
inspected and cleaned. Last weekend, SDO was moved to a fixture for 
rotation from vertical to horizontal to undergo final mechanical work 
and spacecraft cleaning. A spacecraft launch simulation was completed 
at Astrotech Dec. 8.

On Dec. 13, SDO was cleaned and closeouts were performed in the 
horizontal position for the final time. On Tuesday, spacecraft 
closeouts began in preparation for soft storage and fueling 
operations. 

The Kennedy Space Center fueling and propulsion teams prepared for 
fueling activities.

After undergoing preliminary testing, the Atlas and Centaur stages of 
the Atlas V rocket were transported from the hangar at the Atlas 
Spaceflight Operations Center (ASOC), located south of Launch Complex 
41, to the complex's Vertical Integration Facility on Dec. 15. Build 
up of the Atlas V booster began Dec. 15. 



Spacecraft: Geostationary Operational Environmental Satellite (GOES-P)
Launch Vehicle: Delta IV
Launch Pad:  Launch Complex 37, Cape Canaveral Air Force Station, Fla.
Launch Date:  Feb. 25, 2010
Launch Time: TBD 

The GOES-P satellite arrived at NASA's Shuttle Landing Facility from 
its manufacturing plant in El Segundo, Calif., on Dec. 17. Upon 
arrival, the spacecraft was offloaded and transported to the 
Astrotech payload processing facility to begin prelaunch testing.

GOES-P was developed by NASA for the National Oceanic and Atmospheric 
Administration, or NOAA. NASA has contracted with Boeing to build and 
launch the GOES-P spacecraft.

The NASA Launch Services Program at Kennedy is supporting the launch 
in an advisory role. NASA spacecraft project management for GOES-P is 
the responsibility of NASA's Goddard Space Flight Center. After 
launch, once Boeing and NASA have completed on-orbit checkout and the 
spacecraft is operational, it will be turned over to NOAA. 



Previous status reports are available at:

http://www.nasa.gov/centers/kennedy/launchingrockets/status/index.html 
 

	
-end-



To subscribe to the list, send a message to: 
ksc-subscribe@newsletters.nasa.gov
To remove your address from the list, send a message to:
ksc-unsubscribe@newsletters.nasa.gov

[Index of Archives]     [KSC Site]     [NASA News]     [NASA Science News]     [JPL]     [Marshall Space Flight Center]     [NTSB]     [Yosemite News]     [Tuolumne Meadows Campground]     [STB]     [Deep Creek Forum]     [Cassini Status Reports]     [Telescopes]

  Powered by Linux