GRAIL Launch Less Than One Month Away

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Title: GRAIL Launch Less Than One Month Away
JPL/NASA News

News release: 2011-251                                                                     Aug. 11, 2011

GRAIL Launch Less Than One Month Away

The full version of this story with accompanying images is at:
http://www.jpl.nasa.gov/news/news.cfm?release=2011-251&cid=release_2011-251

NASA's twin lunar probes – GRAIL-A and GRAIL-B - completed their final inspections and were weighed one final time at the Astrotech Space Operations facility in Titusville, Fla., on Tuesday. The two Gravity Recovery and Interior Laboratory (GRAIL) spacecraft will orbit the moon in formation to determine the structure of the lunar interior from crust to core and to advance understanding of the thermal evolution of the moon. GRAIL's launch period opens Sept. 8, 2011, and extends through Oct. 19. For a Sept. 8 liftoff, the launch window opens at 5:37 a.m. PDT (8:37 a.m. EDT) and remains open through 6:16 a.m. PDT (9:16 a.m. EDT).

Later this week, the two spacecraft will be loaded side-by-side on a special adapter and packaged inside a payload fairing that will protect them during their launch into space. Next week, GRAIL is expected to make the trip from Astrotech to Launch Complex 17 at the Cape Canaveral Air Force Station where it will be mated with its United Launch Alliance Delta II Heavy rocket.

GRAIL-A and GRAIL-B will fly in tandem orbits around the moon for several months to measure its gravity field in unprecedented detail. The mission will answer longstanding questions about Earth's moon, and provide scientists a better understanding of how Earth and other rocky planets in the solar system formed.

NASA's Jet Propulsion Laboratory, Pasadena, Calif., manages the GRAIL mission. The Massachusetts Institute of Technology, Cambridge, is home to the mission's principal investigator, Maria Zuber. The GRAIL mission is part of the Discovery Program managed at NASA's Marshall Space Flight Center in Huntsville, Ala. Lockheed Martin Space Systems, Denver, built the spacecraft. Launch management for the mission is the responsibility of NASA's Launch Services Program at the Kennedy Space Center in Florida. JPL is a division of the California Institute of Technology in Pasadena.

More information about GRAIL is online at: http://grail.nasa.gov

DC Agle
Jet Propulsion Laboratory, Pasadena, Calif.
818-393-9011
agle@xxxxxxxxxxxx

2011-251


- end -


[Index of Archives]     [NASA News]     [Cassini]     [JPL Home]     [NASA KSC]     [NTSB]     [Yosemite News]     [NSF]     [Telescopes]

  Powered by Linux