MARS ODYSSEY THEMIS IMAGES June 12-16, 2006 o Feature of the Week:Snows of Udzha http://themis.asu.edu/feature o THEMIS ART #68 (Released 12 June 2006) http://themis.asu.edu/zoom-20060612a o THEMIS ART #69 (Released 13 June 2006) http://themis.asu.edu/zoom-20060613a o THEMIS ART #70 (Released 14 June 2006) http://themis.asu.edu/zoom-20060614a o THEMIS ART #71 (Released 15 June 2006) http://themis.asu.edu/zoom-20060615a o THEMIS ART #72 (Released 16 June 2006) http://themis.asu.edu/zoom-20060616a All of the THEMIS images are archived here: http://themis.la.asu.edu/latest.html NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.