On Tue, Dec 11, 2012 at 4:48 PM, Damien Lespiau <damien.lespiau at gmail.com> wrote: > FDI_RX_PLL_ENABLE I noticed that we have a restriction on PLL_ENABLE: "After enabling the FDI PLL, software must wait for a warmup period before enabling the link" warmup for this is 25us. Are we covered already with this 220 or should we increase it? I'm not sure. Other than that, feel free to use Reviewed-by: Rodrigo Vivi <rodrigo.vivi at gmail.com> -- Rodrigo Vivi Blog: http://blog.vivi.eng.br