switch master/slve replication

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



hi all,

I have to switch a master/replica in rolling replication.

How I can be sure the replication is totally done ? it's
enough to run

/usr/lib/cyrus/sync_client -v -A

from master ? and then, which operation I have to do ?

thanks in advance

-- 
Never try to teach a pig to sing.
It wastes your time and annoys the pig.
----
Cyrus Home Page: http://www.cyrusimap.org/
List Archives/Info: http://lists.andrew.cmu.edu/pipermail/info-cyrus/
To Unsubscribe:
https://lists.andrew.cmu.edu/mailman/listinfo/info-cyrus



[Index of Archives]     [Cyrus SASL]     [Squirrel Mail]     [Asterisk PBX]     [Video For Linux]     [Photo]     [Yosemite News]     [gtk]     [KDE]     [Gimp on Windows]     [Steve's Art]

  Powered by Linux