Reviewer: Stewart Bryant
Review result: Ready
I am the assigned Gen-ART reviewer for this draft. The General Area
Review Team (Gen-ART) reviews all IETF documents being processed
by the IESG for the IETF Chair. Please treat these comments just
like any other last call comments.
For more information, please see the FAQ at
<
https://trac.ietf.org/trac/gen/wiki/GenArtfaq>.
Document: draft-ietf-lisp-gpe-06
Reviewer: Stewart Bryant
Review Date: 2018-08-24
IETF LC End Date: 2018-09-06
IESG Telechat date: Not scheduled for a telechat
Summary:
This is a well written draft, and I assume that everyone in the WG is happy
that the reduction in size of the Nonce/Map-Version field will not be a problem
in operational networks.
However, I do have a question of why this is being published now on the
Standards Track with a normative reference to draft-ietf-lisp-6834bis.
draft-ietf-lisp-6834bis is only a few weeks old. It will take its time to get
through the IETF process and of course technically may change. If
draft-ietf-lisp-gpe is approved by the IESG it will simply sit on the RFC
Editor's queue until draft-ietf-lisp-6834bis gets through the system, and even
then if there is a change to draft-ietf-lisp-6834bis, then draft-ietf-lisp-gpe
may need to be pulled all the way back to the WG depending on the nature of the
change.
Maybe the plan is that ietf-lisp-rfc6830bis will only take a short while to
finish because I see that other bis drafts will also stall on it. If not I
would have thought that a better approach would be to make this experimental
and point to RFC6834. Then, when RFC6834bis is published to make this draft a
PS pointing to it.