Pranith Kumar Karampuri <pkarampu@xxxxxxxxxx> wrote: > I tried to look into 3 instances of this failure: (...) > same issue as above, two tests are running in parallel. How is it possible? A & that sends a job in the background? Are we sure it is the same regression test run? Or is it two regression test runs that are scheduled simultaneously? -- Emmanuel Dreyfus http://hcpnet.free.fr/pubz manu@xxxxxxxxxx _______________________________________________ Gluster-devel mailing list Gluster-devel@xxxxxxxxxxx http://www.gluster.org/mailman/listinfo/gluster-devel