Is there a Regression Test cycle exist?

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Maybe unit test is too difficult to add to existing code.

I think the following classical cases should be considered integrated into the whole suite regression test.

 

1.       Test Environments

a)         4 nodes with DHT.

b)         A with all performance xlators.

c)         B with all feature xlators.

d)         4*2 nodes with DHT and AFR.

e)         D with all performance xlators.

f)          E with all feature xlators.

2.       Test Case

a)         Small file test. Build kernel or gcc or apache over Env.A-F

b)         Big file test. Run iozone with file larger than 2G.

c)         Huge file test. Construct some huge sparse file larger than 2T.

d)         Failover test. Shutdown 3 node of Env.D~F while Case.A~ Case.C running.

 

Thanks

 


[Index of Archives]     [Gluster Users]     [Ceph Users]     [Linux ARM Kernel]     [Linux ARM]     [Linux Omap]     [Fedora ARM]     [IETF Annouce]     [Security]     [Bugtraq]     [Linux]     [Linux OMAP]     [Linux MIPS]     [eCos]     [Asterisk Internet PBX]     [Linux API]

  Powered by Linux