Re: [PATCH] rebase -i: introduce the 'test' command

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



On 01/12/2018 20:02, Jeff King wrote:
On Thu, Nov 29, 2018 at 09:32:48AM +0100, Johannes Schindelin wrote:

Would it not make more sense to add a command-line option (and a config
setting) to re-schedule failed `exec` commands? Like so:

Your proposition would do in most cases, however it is not possible to
make a distinction between reschedulable and non-reschedulable commands.

True. But I don't think that's so terrible.

What I think is something to avoid is two commands that do something very,
very similar, but with two very, very different names.

In reality, I think that it would even make sense to change the default to
reschedule failed `exec` commands. Which is why I suggested to also add a
config option.

I sometimes add "x false" to the top of the todo list to stop and create
new commits before the first one. That would be awkward if I could never
get past that line. However, I think elsewhere a "pause" line has been
discussed, which would serve the same purpose.

I wonder how often this kind of "yes, I know it fails, but keep going
anyway" situation would come up. And what the interface is like for
getting past it. E.g., what if you fixed a bunch of stuff but your tests
still fail? You may not want to abandon the changes you've made, but you
need to "rebase --continue" to move forward. I encounter this often when
the correct fix is actually in an earlier commit than the one that
yields the test failure. You can't rewind an interactive rebase, so I
complete and restart it, adding an "e"dit at the earlier commit.

How would I move past the test that fails to continue? I guess "git
rebase --edit-todo" and then manually remove it (and any other remaining
test lines)?

Perhaps we could teach git rebase --skip to skip a rescheduled command, it could be useful if people want to skip rescheduled picks as well (though I don't think I've ever had that happen in the wild). I can see myself turning on the rescheduling config setting but occasionally wanting to be able to skip over the rescheduled exec command.


Best Wishes

Phillip

That's not too bad, but I wonder if people would find it more awkward
than the current way (which is to just "rebase --continue" until you get
to the end).

I dunno. I am not sure if I am for or against changing the default, so
these are just some musings. :)

-Peff





[Index of Archives]     [Linux Kernel Development]     [Gcc Help]     [IETF Annouce]     [DCCP]     [Netdev]     [Networking]     [Security]     [V4L]     [Bugtraq]     [Yosemite]     [MIPS Linux]     [ARM Linux]     [Linux Security]     [Linux RAID]     [Linux SCSI]     [Fedora Users]

  Powered by Linux