Hello fio team, Does it possible with fio to simulate a job with IO mixed for simulating a typical workload of an Oracle database. 1. 12% seqread 2. 8% seqwrite 3. The rest 80% are random of this 30% (24% from total) is write and 70% (56% from total) reads. I know our to test every step alone but i want to test step 1,2 and 3 in the same time. Regards, Thierry -- To unsubscribe from this list: send the line "unsubscribe fio" in the body of a message to majordomo@xxxxxxxxxxxxxxx More majordomo info at http://vger.kernel.org/majordomo-info.html