As a heads up, all QA services will be affected by the infra outages scheduled over the next 3 days: 2014-12-15, 2014-12-16 and 2014-12-17. Taskotron and Blockerbugs will be affected by all three outages but Beaker will be less affected due to how it's deployed as a non-production service. https://fedorahosted.org/fedora-infrastructure/ticket/4614 We'll keep Taskotron up and running as best we can during the downtime and will be keeping track of missed jobs that need to be run after the downtime is complete. Blockerbugs will be synced after the outage is complete and outside of not being available during some of the outage times, should not be affected. Tim
Attachment:
pgpgthZuMaNby.pgp
Description: OpenPGP digital signature
-- test mailing list test@xxxxxxxxxxxxxxxxxxxxxxx To unsubscribe: https://admin.fedoraproject.org/mailman/listinfo/test