On Thu, May 30, 2019 at 4:16 PM Ben Cotton <bcotton@xxxxxxxxxx> wrote: > > Daniel added more contingency details to the proposal[1], but I want > to call out the contingency date. Right now it is listed as a week > before the final freeze, which is way too late. I would suggest that > the end of the mass rebuild is the appropriate contingency point. If a > second mass rebuild is required to revert this change, we can't wait > until right before final freeze. Major features should be complete prior to Beta Freeze so any contingency needs to be before that, in the case of something that needs a mass rebuild it obviously needs to be complete prior to that and if something comes up during mass rebuild I suspect a contingency should be executed around that time as if there's another (partial) rebuild needed that should happen before branching. Peter _______________________________________________ devel mailing list -- devel@xxxxxxxxxxxxxxxxxxxxxxx To unsubscribe send an email to devel-leave@xxxxxxxxxxxxxxxxxxxxxxx Fedora Code of Conduct: https://getfedora.org/code-of-conduct.html List Guidelines: https://fedoraproject.org/wiki/Mailing_list_guidelines List Archives: https://lists.fedoraproject.org/archives/list/devel@xxxxxxxxxxxxxxxxxxxxxxx