[PATCH drm-misc-next] drm/nouveau: sched: avoid job races between entities

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



If a sched job depends on a dma-fence from a job from the same GPU
scheduler instance, but a different scheduler entity, the GPU scheduler
does only wait for the particular job to be scheduled, rather than for
the job to fully complete. This is due to the GPU scheduler assuming
that there is a scheduler instance per ring. However, the current
implementation, in order to avoid arbitrary amounts of kthreads, has a
single scheduler instance while scheduler entities represent rings.

As a workaround, set the DRM_SCHED_FENCE_DONT_PIPELINE for all
out-fences in order to force the scheduler to wait for full job
completion for dependent jobs from different entities and same scheduler
instance.

There is some work in progress [1] to address the issues of firmware
schedulers; once it is in-tree the scheduler topology in Nouveau should
be re-worked accordingly.

[1] https://lore.kernel.org/dri-devel/20230801205103.627779-1-matthew.brost@xxxxxxxxx/

Signed-off-by: Danilo Krummrich <dakr@xxxxxxxxxx>
---
 drivers/gpu/drm/nouveau/nouveau_sched.c | 22 ++++++++++++++++++++++
 1 file changed, 22 insertions(+)

diff --git a/drivers/gpu/drm/nouveau/nouveau_sched.c b/drivers/gpu/drm/nouveau/nouveau_sched.c
index 3424a1bf6af3..88217185e0f3 100644
--- a/drivers/gpu/drm/nouveau/nouveau_sched.c
+++ b/drivers/gpu/drm/nouveau/nouveau_sched.c
@@ -292,6 +292,28 @@ nouveau_job_submit(struct nouveau_job *job)
 	if (job->sync)
 		done_fence = dma_fence_get(job->done_fence);
 
+	/* If a sched job depends on a dma-fence from a job from the same GPU
+	 * scheduler instance, but a different scheduler entity, the GPU
+	 * scheduler does only wait for the particular job to be scheduled,
+	 * rather than for the job to fully complete. This is due to the GPU
+	 * scheduler assuming that there is a scheduler instance per ring.
+	 * However, the current implementation, in order to avoid arbitrary
+	 * amounts of kthreads, has a single scheduler instance while scheduler
+	 * entities represent rings.
+	 *
+	 * As a workaround, set the DRM_SCHED_FENCE_DONT_PIPELINE for all
+	 * out-fences in order to force the scheduler to wait for full job
+	 * completion for dependent jobs from different entities and same
+	 * scheduler instance.
+	 *
+	 * There is some work in progress [1] to address the issues of firmware
+	 * schedulers; once it is in-tree the scheduler topology in Nouveau
+	 * should be re-worked accordingly.
+	 *
+	 * [1] https://lore.kernel.org/dri-devel/20230801205103.627779-1-matthew.brost@xxxxxxxxx/
+	 */
+	set_bit(DRM_SCHED_FENCE_DONT_PIPELINE, &job->done_fence->flags);
+
 	if (job->ops->armed_submit)
 		job->ops->armed_submit(job);
 

base-commit: 68132cc6d1bcbc78ade524c6c6c226de42139f0e
-- 
2.41.0




[Index of Archives]     [Linux DRI Users]     [Linux Intel Graphics]     [Linux USB Devel]     [Video for Linux]     [Linux Audio Users]     [Yosemite News]     [Linux Kernel]     [Linux SCSI]     [XFree86]     [Linux USB Devel]     [Video for Linux]     [Linux Audio Users]     [Linux Kernel]     [Linux SCSI]     [XFree86]
  Powered by Linux