Re: [PATCH 2/2] drm/scheduler: remove sched field from the entity

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Nayan Deshmukh <nayan26deshmukh@xxxxxxxxx> writes:

> The scheduler of the entity is decided by the run queue on which
> it is queued. This patch avoids us the effort required to maintain
> a sync between rq and sched field when we start shifting entites
> among different rqs.

Reviewed-by: Eric Anholt <eric@xxxxxxxxxx>

Attachment: signature.asc
Description: PGP signature

_______________________________________________
dri-devel mailing list
dri-devel@xxxxxxxxxxxxxxxxxxxxx
https://lists.freedesktop.org/mailman/listinfo/dri-devel

[Index of Archives]     [Linux DRI Users]     [Linux Intel Graphics]     [Linux USB Devel]     [Video for Linux]     [Linux Audio Users]     [Yosemite News]     [Linux Kernel]     [Linux SCSI]     [XFree86]     [Linux USB Devel]     [Video for Linux]     [Linux Audio Users]     [Linux Kernel]     [Linux SCSI]     [XFree86]
  Powered by Linux