Re: [PATCH 02/23] io-controller: Core of the elevator fair queuing

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Vivek Goyal wrote:
o This is core of the io scheduler implemented at elevator layer. This is a mix
  of cpu CFS scheduler and CFQ IO scheduler. Some of the bits from CFS have
  to be derived so that we can support hierarchical scheduling. Without
  cgroups or with-in group, we should essentially get same behavior as CFQ.

o This patch only shows non-hierarchical bits. Hierarhical code comes in later
  patches.

o This code is the building base of introducing fair queuing logic in common
  elevator layer so that it can be used by all the four IO schedulers.

Signed-off-by: Fabio Checconi <fabio@xxxxxxxxxxxxxxxx>
Signed-off-by: Paolo Valente <paolo.valente@xxxxxxxxxx>
Signed-off-by: Nauman Rafique <nauman@xxxxxxxxxx>
Signed-off-by: Vivek Goyal <vgoyal@xxxxxxxxxx>

Acked-by: Rik van Riel <riel@xxxxxxxxxx>

--
All rights reversed.

--
dm-devel mailing list
dm-devel@xxxxxxxxxx
https://www.redhat.com/mailman/listinfo/dm-devel

[Index of Archives]     [DM Crypt]     [Fedora Desktop]     [ATA RAID]     [Fedora Marketing]     [Fedora Packaging]     [Fedora SELinux]     [Yosemite Discussion]     [KDE Users]     [Fedora Docs]

  Powered by Linux