On Thu, Oct 10, 2013 at 05:51:00PM +0100, Mark Rutland wrote: > On Thu, Oct 10, 2013 at 12:10:53PM +0100, Chanwoo Choi wrote: > > Turn on ramp control of buck2/3/4. > Ok, but why does this need to be in the dt? Ramp control is a hardware system integration decision which people working with regulators should be familiar with - you're trading off speed of power on or voltage change for maximum current draw from the regulator supply. The term should be sufficiently clear to an engineer who can make an informed decision about using it.
Attachment:
signature.asc
Description: Digital signature