We’re adding in a CRUSH hierarchy retrospectively in preparation for a big expansion. Previously we only had host and osd buckets, and now we’ve added in rack buckets.
I’ve got sensible settings to limit rebalancing set, at least what has worked in the past:
osd_max_backfills = 1
osd_recovery_threads = 1
osd_recovery_priority = 5
osd_client_op_priority = 63
osd_recovery_max_active = 3
I thought it would save a lot of unnecessary data movement if I move the existing host buckets to the new rack buckets all at once, rather than host-by-host. As long as recovery is throttled correctly, it shouldn’t matter how many objects are misplaced, the
thinking goes.
1) Is doing all at once advisable, or am I putting myself at a much greater risk if I do have failures during the rebalance (which could take quite a while)?
2) My failure domain is currently set at the host level. If I want to change the failure domain to ‘rack’, when should I best change this (e.g. after the rebalancing finishes for moving the hosts to the racks)?
v12.2.2 if it makes a difference.
Cheers,
Sean M
|
_______________________________________________ ceph-users mailing list ceph-users@xxxxxxxxxxxxxx http://lists.ceph.com/listinfo.cgi/ceph-users-ceph.com