Planning Mail Server (with low resources)

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]



Chris Mauritz wrote:

> I'd suggest a gig of RAM and a gig of swap.  IDE disks are also cheap so 
> it might be better to upgrade it to something like a 300 or 400gig drive 
> now than to wait until you run out of space in the very near future.

Speaking of future disk expansions.  It might be smart move to place all 
file systems (or at least /var/spool/imap) under LVM.  That way he can 
simply add new disks into volume group, assign additional space to 
logical volume where /var/spool/imap file system resides, and resize 
file system to the new size of logical volume.  The only downtime would 
be to physically attach new disk(s).  Everything after that can be 
performed while the system is up and running (and users are using it).

[Index of Archives]     [CentOS]     [CentOS Announce]     [CentOS Development]     [CentOS ARM Devel]     [CentOS Docs]     [CentOS Virtualization]     [Carrier Grade Linux]     [Linux Media]     [Asterisk]     [DCCP]     [Netdev]     [Xorg]     [Linux USB]
  Powered by Linux