The most recent spacecraft telemetry was acquired on April 12 from
the Deep Space Network tracking complex at Goldstone, California.
The Cassini spacecraft is in an excellent state of health and all
subsystems are operating normally. Information on the present
position and speed of the Cassini spacecraft may be found on the
"Present Position" page at:
http://saturn.jpl.nasa.gov/mission/presentposition/.
Wednesday, April 6 (DOY 096)
In science this week, the observations continued from the last two
weeks with a focus on the Magnetospheric and Plasma Science (MAPS)
instruments making measurements of the distant reaches of Saturn's
magnetosphere. The Ultraviolet Imaging Spectrograph (UVIS) performed
two more of its series of repeated slews across the auroral oval of
Saturn for 17 hours each, a special set of observations that are
coordinated with Hubble Space Telescope observations of Saturn's
aurorae. Today the Composite Infrared Spectrometer (CIRS), Visual
and Infrared Mapping Spectrometer (VIMS), and the Imaging Science
Subsystem (ISS) made an observation of Titan from a distance of 2
million km to look for changes in the surface and to monitor clouds.
An encounter strategy meeting was held today to cover the period
between Apr. 19 and May 8, Titan flybys T75 and T76, and maneuvers
281-283.
A Delivery Coordination Meeting for the Maneuver Automation Software
(MAS) v9.1.1 and nine Cassini Spacecraft Analysis Subsystem (CSAS)
tools took place today. The tools in the CSAS delivery were all
updated to correct a Multi-mission Spacecraft Analysis Subsystem
(MSAS) library issue that was reporting a 2011 date error.
Thursday, April 7 (DOY 097)
An article called "ESA scientists honored by the European Geosciences
Union in Vienna" was made available on the Cassini web site today.
Two European Space Agency (ESA) scientists were recognized, one with
the Jean Dominique Cassini Award and the other with the David Bates
Award, at a ceremony in Vienna, presented by the European Geosciences
Union (EGU). The EGU is dedicated to the pursuit of excellence in
geosciences as well as planetary and space sciences for the benefit
of humanity. These two awards, along with others, are given out at
their annual conference for outstanding contributions in these areas.
For images and more information on this subject, link to:
http://sci.esa.int/science-e/www/object/index.cfm?fobjectid=48602.
Friday, April 8 (DOY 098)
Some Cassini scientists attended the European Geoscience Union (EGU)
General Assembly in Vienna held Apr. 4-8, where several sessions were
focussed on Cassini results.
Teacher professional development workshop proposals for "Reading,
Writing & Rings", "Cassini Scientist for a Day", and "Our Solar
System Through the Eyes of Scientists" were submitted today for the
2012 National Science Teachers Association annual conference to be
held in Indianapolis on Mar. 28-Apr. 1, 2012.
Saturday, April 9 (DOY 099)
The Instrument Operations System/Multi Mission Image Processing
Laboratory (IOS/MIPL) Integration and Test (I&T) team continued
testing Cassini Delivery 39.1; testing is approximately 85% complete.
This is in preparation for the CAS D39.1 IOS/MIPL delivery meeting
scheduled for Apr. 20. This delivery implements enhancements
essential for Instrument Operations (IO) workforce reduction in the
Solstice Mission, and to correct bugs and deficiencies recently
identified in operations.
Sunday, April 10 (DOY 100)
The Instrument Operations/Visual and Infrared Mapping Spectrometer
(IO/VIMS) instrument team supported science team requests for testing
on ground support equipment to determine the feasibility of exoplanet
characterization observations. Several test cases were exercised and
sample products were delivered to the team.
Monday, April 11 (DOY 101)
The monthly Project science teleconference was held today with
discussion on topics such as the new Cassini Participating Scientists
program, session proposals for the American Geophysical Union (AGU)
meeting in December, and the latest activities of each of the teams.
The Downlink Ground System (DGS) team along with the support of other
Cassini teams completed Java Distributed Object Manager (DOM)
end-to-end tests on the Network File System (NFS). Testing resulted
in the reporting of ten issues; one major issue found was the
corruption of a file. This issue is currently being investigated
since it cannot be reproduced and is still not determined to be DOM
related.
Orbit Trim Maneuver (OTM) #280, the Titan T75 approach maneuver, was
scheduled this week for processing, approval, uplink and execution
Friday evening, Apr. 15. There is potential for cancellation.
Tuesday, April 12 (DOY 102)
The Attitude and Articulation Control Subsystem (AACS) Periodic
Engineering Maintenance was completed today. This activity,
performed approximately every 90 days, contained only the Backup ALF
Injection Loader (BAIL) maintenance and Engine Gimbal Actuator (EGA)
exercise. The backup reaction wheel assembly (RWA) exercise was
unnecessary since RWA-3 is in use during this S67 sequence.
The DGS team provided an Acelog demonstration to the Operations Team
last week, and another demonstration will be given later in the week.
Acelog V1.0, the replacement tool for the Operations Log (OLOG), will
be formally delivered and released into operations at the end of
April. Plans for an Acelog V2.0 release are tentatively scheduled
for the end of next month.
------------------------
To unsubscribe from Cassini Spacecraft Updates or to subscribe with a
different email address, visit:
<http://saturn.jpl.nasa.gov/news/mailinglistsignup/ >
------------------------
This email address is not monitored. For comments and questions,
please contact Cassini Outreach at:
<http://saturn.jpl.nasa.gov/feedback/>
------------------------
Visit the JPL Cassini home page for more information about the
Cassini Project: <http://saturn.jpl.nasa.gov/>
------------------------