Cassini Significant Events for 09/12/07 - 09/18/07

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Cassini Significant Events 
for 09/12/07 - 09/18/07

The most recent spacecraft telemetry was acquired on Tuesday, September 18,
from the Madrid tracking complex. The Cassini spacecraft is in an excellent
state of health and all subsystems are operating normally. Information on
the present position and speed of the Cassini spacecraft may be found on the
"Present Position" web page located at
http://saturn.jpl.nasa.gov/operations/present-position.cfm.

Wednesday, September 12 (DOY 255):

The official port for the S36 Science Operations Plan Update process
occurred today.  The products were merged and reports delivered to the teams
and AACS for end-to-end pointing analysis.  This process completes on
Friday, September 28.

At the end of the Significant Events report from last week it was stated
that the flight team had just held an anomaly resolution meeting, and had
selected a plan for recovery of the instruments and the background sequence.
The Solid State Power Switch (SSPS) trip on TWTA-B last week was the first
switch trip since November 26, 2006.   The SSPSs are susceptible to Galactic
Cosmic Rays, and trips are predicted to occur at a rate of about two per
year.  Cassini has now had 21 such trips in 10 years of flight since launch.
This particular trip caused a loss of power to a Traveling Wave Tube
Amplifier (TWTA), subsequent RF loss, a call to System Fault Protection
(SFP), and put the spacecraft in "safe mode".

On Tuesday of last week, as soon as the SSPS trip had been confirmed as the
cause of SFP execution, real time commanding was begun to initiate the
process of putting the spacecraft back in a nominal operational
configuration, and to play back the remaining on-board Iapetus data.
On Wednesday, Sept. 12, commands were sent to power on the Visual and
Infrared Mapping Spectrometer (VIMS) and its supplemental heater.  This was
followed by commands to prepare the spacecraft to execute OTM-128.

Thursday, September 13 (DOY 256.):

Orbit Trim Maneuver (OTM) #128 was performed today.  This is the cleanup
maneuver from the Iapetus encounter on Sept. 10.  The main engine burn began
at 12:44 PM PDT. Telemetry immediately after the maneuver showed the burn
duration was 83.4 seconds, giving a delta-V of 13.48 m/s. All subsystems
reported nominal performance after the maneuver.

This OTM was performed before the spacecraft had been fully reconfigured
after safing, without a background sequence running.  Real time commands
were uplinked to set up the initial and final conditions for the burn.
Because the reaction wheels (RWA) had been turned off by safing, thrusters
were used for both the roll and yaw turns before the OTM.  Usually rolls are
on RWAs and yaws are on thrusters for a Main Engine maneuver.  The OTM block
turned the RWAs on following the burn.

Normal operations continued on the ground with meetings being held for an
S39 Engineering Activities Review, and a Simulation Coordination meeting for
S35.  The SIM coordination meeting is for a test of the Titan 38 flyby
sequence.  AACS requested a test to examine the low altitude flyby on
reaction wheels to verify uncertainties in the RWAs and to validate the
Kinematic Prediction Tool and Flight Software Development System testing. 

Friday, September 14 (DOY 257):

With OTM-128 having been successfully executed, commands were sent to swap
from TWTA-A back to TWTA-B.  The TWTA RF Loss algorithm causes hardware
swaps in both the Telemetry and Command Units and the TWTAs.  The swap was
successful and the spacecraft is now operating normally on TWTA-B.

At this point the instruments and background sequence are still "off."

On the ground, work continued on the proposed Extended Mission.  The second
set of Cassini Information Management System extended mission inputs was
delivered today.  Requests for observations, spacecraft activities,
downlinks, OTMs, etc., were submitted for orbits 80 through 102.  The Target
Working Teams will begin working these segments next week to smooth out
conflicts where they occur.

An image of Iapetus is Astronomy Picture of the Day today.

Saturday, September 15 (DOY 258)

Commands were sent to prepare the background sequence for activation, the
instruments were powered on, and instrument team members reported that they
were ready for the next step.

A 3-D image of Iapetus' equatorial ridge was Astronomy Picture of the Day
today.

Sunday, September 16 (DOY 259)

The S33 background sequence was reactivated on Sunday at 259T21:09:36 SCET.
Science activities resumed with imaging and Visual and Infrared Mapping
Spectrometer Saturn southern hemisphere movies and an Iapetus global color
observation, an Ultraviolet Imaging Spectrograph calibration and Saturn
mosaic, and the acquisition of some optical navigation images.  The
spacecraft and instruments have now resumed normal operations.

Monday, September 17 (DOY 260)

Orbit Trim Maneuver (OTM) #129 was performed today.  This is the apoapsis
maneuver setting up for the Titan 36 encounter on Oct. 2.  The reaction
control subsystem burn began at 12:45pm PDT. Telemetry immediately after the
maneuver showed the burn duration was 79.0 seconds, giving a delta-V of 98.5
mm/sec. All subsystems reported nominal performance after the maneuver.

Command and Data Subsystem (CDS) flight software (FSW) V10 final end-to-end
testing was completed Sept. 12.  The Software Requirements Certification
Review for this FSW was held Sept. 13, and the Uplink Readiness Review was
completed today.  The uplink to the solid-state recorder is planned for
Sept. 24 - 26.  Activation and checkout of V10 on-board the spacecraft will
start the week of Oct. 7.

The Science Operations Plan Update process for S37 kicked off today.  The
preliminary port is scheduled for Oct. 2, with the process completing on
Oct. 27.

Tuesday, September 18 (DOY 261)

After a delay of one day due to the safing event last week, sequence leads
for S34 began uplinking Instrument Expanded Block (IEB) files today in
preparation for the start of execution of the sequence on Sept. 22.  The
remaining IEBs go up tomorrow and the S34 background sequence - part A -
will go up on Thursday.

S34 is unique in that it is divided into four parts to allow for the uplink
and checkout of the CDS V10 flight software while accommodating as much
science as possible, including a Hyperion flyby, around the CDS activities.
The final approval meeting was held today for parts A and B of the sequence
along with the Hyperion mini-sequence.  The CDS activities following part A
are performed independent of the background sequence via real time commands.
One open issue still to be addressed for S34 is what possible options to
pursue if the DAWN project reschedules launch from Sept. 26.

Wrap up:

Check out the Cassini web site at http://saturn.jpl.nasa.gov for the latest
press releases and images.

The Cassini-Huygens mission is a cooperative project of NASA, the European
Space Agency and the Italian Space Agency. The Jet Propulsion Laboratory, a
division of the California Institute of Technology in Pasadena, manages the
Cassini-Huygens mission for NASA's Science Mission Directorate, Washington,
D.C.  JPL designed, developed and assembled the Cassini orbiter.


---
To unsubscribe from Cassini Spacecraft Updates, send a message to leave-cassini-@xxxxxxxxxxxxxxxxx
---
Visit the JPL Cassini home page for more information about the Cassini Project: <http://saturn.jpl.nasa.gov/>


[Index of Archives]     [NASA News]     [JPL Home]     [JPL News]     [NASA KSC]     [NTSB]     [Hot Springs]     [Yosemite Info]     [NASA News]     [Telescopes]

  Powered by Linux