Collabora weekly progress w/e 11th July 2021

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Hi All,

Please find below a brief summary of the progress Collabora have made last week on Weston/Wayland and Pipewire.

Weston/Wayland

Marius:
- SPEC-3423 (Demo apps should fetch the protocol extension from the compositor) and the follow-up to that SPEC-4015 (Move protocol files to the -dev package)
- Opened SPEC-4009 to track 'WAM - Support multiple client surfaces for the client shell', in continuation of SPEC-3799 (Left icon bar overlapping launcher area). Had some basic interaction over the PR -- looking into SPEC-4000 ([WAM] Investigate API/methods of retrieval page status/load status)
- SPEC-4020 (Investigate tearing for the rpi4 platform) - Looking into repaint algorithm to dermine root cause of tearing.

IC Sound Manager

George:
- Built and tested agl-lxc image
- Split wpipc to a new repository, renamed it to icipc and reduced its dependencies down to none for the client side and pipewire-only for the server side. This is to aid deployment of the client in the IC container, so that no other dependency layer needs to be pulled

Kind regards,

Nick
_._,_._,_

Links:

You receive all messages sent to this group.

View/Reply Online (#9308) | Reply To Group | Reply To Sender | Mute This Topic | New Topic
Your Subscription | Contact Group Owner | Unsubscribe [list-automotive-discussions82@xxxxxxxxxxx]

_._,_._,_

[Index of Archives]     [LARTC]     [Bugtraq]     [Yosemite Forum]     [Photo]

  Powered by Linux