Hello, As the development pace is faster than that of release, I’m
wondering how the patch tracking works. For example, there are two outstanding
patches for rc14: Patch1:
a new feature added on rc14. Patch2:
a bug fix at the rc14. A new patch Patch3 is required to fix a bug caused by
Patch1. Is it to possible to recall Patch1? If not, should Patch3 include Patch1
change when diff is applied? In addition, another new feature is developed based on all
the changes from patch 1 to 3. What is the diff against rc14 or
(rc14+Patch1+Patch2+Patch3)? Thanks, Ying |
_______________________________________________ Ataraid-list mailing list Ataraid-list@xxxxxxxxxx https://www.redhat.com/mailman/listinfo/ataraid-list